Written Scope: Managed Pipeline, RFQ Version, Monthly Report
Sample
- Prepared for
- An 80-person fabrication and machine shop in Houston (fictional)
- Their team
- Owner, operations manager, manufacturing engineer, quality manager, three estimators, and two inside sales reps, with four rep firms and three distributors in the field
- Lead
- Joe Zeng
- Version
- 1, approved by both sides before work starts
1. The Goal
Why It's Here
Engineers and buyers choose the shop, so a PO can't be promised. What's written here is the work, and the report counts it.
More of the right RFQs in front of your estimators, every open quote followed up, and new accounts beyond the buyers who carry the shop today. See it on one page each month.
What we're working toward: every RFQ logged with its source and the first POs from new accounts by Day 90, and the share of orders from your top three buyers down from about 61% over the last two years to under 50% within 12 months. These are targets. The commitment is the work in this scope, done every week, with the count on each monthly report.
2. Reps, Distributors, and Direct Sales
Why It's Here
Reps and distributors sell your work where you have nobody. Written territory rules keep marketing from going around them.
- A lead from a rep's territory goes to that rep.
- Website RFQs and trade show scans from a rep's territory reach that rep the same business day, with a copy to your inside sales reps.
- A distributor's accounts follow your agreement with that distributor. We never contact a distributor's customer around them.
- Direct accounts, the OEMs and plants you sell to yourself, get their own target list and follow-up.
- Your agreements with reps and distributors decide who owns which account. Where one is unclear, your owner decides, and the rule is written here.
3. The First 90 Days
Why It's Here
Three steps, each with a finish line: read what the quote log already says, show what the shop makes, then go after new accounts.
- Days 1 to 30: Read the Quote Log
- Two years of quotes and orders pulled from your ERP: what you quoted, what you won, which buyers went quiet, and how much of the work came from your top accounts. A walk through the shop for the real capability list. Interviews with your estimators and two reps. Every RFQ logged with its source from Week 2.
- Days 31 to 60: Show What the Shop Makes
- Capability pages for your top processes and materials, a quality page with each certificate, and an RFQ form that takes drawings. A current capability sheet to every rep firm and distributor. A follow-up rule for every open quote.
- Days 61 to 90: Open New Accounts
- The target list of OEMs and plants that buy what you make and don't buy it from you yet. Weekly research briefs and follow-up drafts. Follow-up on the scans from the last trade show. The first monthly report closes the quarter.
Weeks count from the kickoff call. Each step starts once your owner approves the one before it, and the dates below put a week on each part.
4. The Work
Why It's Here
Each line becomes a count on the monthly page: RFQs, quotes, follow-ups, sheets sent, and new accounts.
- RFQ log
- Every RFQ logged the day it arrives, with its source (website, rep, distributor, trade show, repeat buyer, or target account), the process and material, the estimator, and the day the quote went out.
- Capability pages
- One page for each process, material, or part type you want more of, such as machined flanges, pipe spools, skid bases, and structural platforms, with the sizes and materials your engineer confirms. Written for the engineer who specifies the part, and live only after your engineer approves it.
- RFQ form
- Takes drawings and specs as uploads, such as PDF, STEP, and DWG files, and reaches the right estimator the same business day. Files land in your own storage.
- Quote follow-up
- Every open quote in your ERP gets a follow-up drafted for day 3 and day 10, in the voice of the account owner: your inside sales reps for direct accounts, or the rep for their territory. The account owner approves it and sends it.
- Rep and distributor sheets
- A capability sheet in the format each rep firm and distributor asks for, kept current, with a short note each quarter on new machines, processes, or certificates.
- Trade show follow-up
- After each show, such as OTC or FABTECH, every badge scan is logged and a follow-up drafted within 2 business days of the show. Scans from a rep's territory go to that rep.
- Target list
- Built from your ERP quote and order history: OEMs, compressor packagers, EPCs, and plants that buy flanges, spools, skids, or platforms and don't buy them from you yet. 15 accounts researched each week from Week 10, with a brief on the 5 that score highest.
- Quality page
- Each certificate the shop holds, shown as the document, with what it covers and when it expires. The next section lists them.
- Monthly report
- One page by the fourth business day of each month: RFQs by source, RFQ fit by process, quote turnaround, quotes followed up, win rate by channel, new accounts with a first PO, the share from your top three buyers, what's stuck, and what changes next.
- Monthly review
- A 45-minute call by phone or Google Meet, or at the shop in Houston, in the first week of each month.
5. The Quality Page
Why It's Here
Buyers qualify a new shop on its certificates. Showing the document, its scope, and its expiry beats any adjective on a homepage.
Your quality manager supplies every certificate and approves every line. We describe what each one covers and track each expiry date. No quality number, such as a defect rate, goes on the page unless your quality manager supplies it and approves it.
- Your quality registration certificate, such as ISO 9001, with the registrar, the scope it covers, and its expiry date.
- Any code stamp the shop holds, such as an ASME stamp for pressure work, with what it covers and when it expires.
- Welding procedures and welder qualifications, described by the codes they follow, with copies sent on request.
- Material test reports and certificates of conformance: how a buyer asks for them with an order.
- Your inspection equipment, such as a CMM, described in words your quality manager approves.
Sample list. Your page shows only the certificates the shop actually holds.
6. Drawings, Specs, and AI
Why It's Here
Customer drawings often come under an NDA. Keeping them out of AI tools unless this scope approves it protects the shop and its buyers.
- Customer drawings, specs, and quotes never go into an AI tool unless this scope approves it.
- Approved in this version: the AI drafting tool named under Tools may read a quote's number, part description, and date to draft its follow-up. Never the drawing, the spec, or the quoted figures.
- RFQ form uploads land in your SharePoint or Google Drive and go straight to the estimator. We open a drawing only when an estimator asks us to route it.
- A drawing a buyer marks confidential is handled the way that buyer's agreement says, and never shown on a capability page. Photos of a buyer's parts go up only with that buyer's OK.
7. What We Don't Do
Why It's Here
Your estimators set every quote, and your quality manager owns every claim. Our job is making sure the right buyers find both.
We don't estimate jobs, set lead times, or write quotes. Your estimators own those, in your ERP.
We don't speak for your quality manager or change a certificate. Every quality line comes from them.
We don't call on buyers. Your inside sales reps, your rep firms, and your distributors keep every relationship.
8. Who Does What
Why It's Here
Your estimators, reps, and distributors keep every buyer. We keep the log, the pages, and the drafts moving behind them.
Who does each part of the work: the shop or Apex Local Task The shop Apex Local Talk to buyers and engineers The shop: Your inside sales reps, rep firms, and distributors Apex Local: Never Estimates, quotes, and lead times The shop: Your estimators, in your ERP Apex Local: Never Approve and send every quote follow-up The shop: The account owner: inside sales, or the rep for that territory Apex Local: Drafts it, and Joe checks it before it reaches them Capability pages and sheets The shop: Your engineer approves every capability page, and your operations manager confirms each sheet Apex Local: Writes them and keeps them current Quality page The shop: Your quality manager supplies and approves it Apex Local: Writes the page around the documents RFQ log and target list The shop: Your owner can strike any account Apex Local: Builds them and keeps them current Monthly report The shop: Reads it Apex Local: Writes it Joe Zeng leads the work and checks every line of the monthly report. AI drafts the first version. A web developer builds the RFQ form and the capability pages in Days 31 to 60: [Name], named in your scope before that work starts.
Backup: [Name], a specialist Joe works with, named in your scope before work starts, keeps the RFQ log, the follow-up drafts, and the monthly report on time if Joe is out.
9. Tools
Why It's Here
The shop's ERP stays the record of every quote. Any other tool is named here first, in the shop's own account.
- Your ERP
- JobBOSS, E2 Shop System, Epicor, or whichever you run. A saved report of open quotes and new orders, exported each morning, set up with your operations manager. We read from it and never write to it.
- RFQ log
- A shared Excel workbook in your SharePoint, or the CRM you already have, if your team agrees in Week 2 to use it. No new CRM is added.
- Your website
- Capability pages, the quality page, and the RFQ form go on your current site, with you as the admin.
- Your inside sales reps' Outlook and each rep firm's own email. Every follow-up goes out from the account owner.
- n8n
- Moves the morning ERP export into the RFQ log and queues each day's follow-up drafts. In your company's account.
- Apollo or ZoomInfo
- OEM and plant contacts for the target list, picked with you in Week 8, in your company's account.
- AI drafting tools
- Used for research briefs and first drafts of pages and follow-ups. Each one is named here before you sign, with what its terms say about training on your data, and none reads a drawing or a spec.
We read your ERP's export options and the current integration list for each tool before setup, and note here how they connect. A gap gets a written workaround.
10. Email Rules
Why It's Here
Buyers and engineers get one careful email from someone they know, never a sequence from a stranger's domain.
- Every email goes out from the account owner's own inbox, after they approve it. No new sending domains, and no automated sequences.
- Quote follow-ups go only to the buyer or engineer who asked for the quote.
- Any commercial email to a new account carries a working unsubscribe line, which the CAN-SPAM Act requires, and a request to stop is honored that day.
- Replies go straight to the account owner. A reply about a failed part, a leak, or a safety issue at a plant is flagged for a call right away.
11. Accounts and Data
Why It's Here
Quote history, drawings, and every login stay in the shop's name, so nothing leaves with us if the work stops.
- Every account is in your company's name: the website, the RFQ log, n8n, and the contact data tool. Your owner holds the admin logins, and we get user access.
- Quotes and orders stay in your ERP, and drawings stay in your storage. We read the morning export and don't copy quotes or drawings into our own systems.
- Our access comes off within 2 business days of the work ending or your request, whichever comes first, and your operations manager gets the RFQ log, the target list, and every workflow, with a one-page note.
- A written request gets anything of yours deleted from our own systems within 30 days. Our engagement record, the scope and each monthly report, is otherwise kept up to 3 years after our last contact.
12. What a Person Approves
Why It's Here
The account owner sends every follow-up. Joe checks each AI draft before an owner, an estimator, or a rep reads it.
- Every quote follow-up: the account owner approves it and sends it, and for a rep's territory, that rep does.
- Every capability page: your engineer approves it before it goes live, so nothing claims more than the shop can make. Every capability sheet: your operations manager confirms it.
- The quality page and every certificate line: your quality manager approves them.
- The target list: your owner can strike any account before outreach.
- Any AI tool that would read a drawing, a spec, or a quote's figures: a written change to this scope, approved by your owner, first.
- Joe checks every AI draft before an account owner sees it.
13. Dates
Why It's Here
Every week below sits inside one of the three steps, so a late item shows up weeks before Day 90.
- Week 1
- Kickoff call. The morning ERP export set up with your operations manager. Two years of quotes and orders pulled.
- Week 2
- The RFQ log goes live, with every new RFQ logged by source. Interviews with your estimators and two reps.
- Week 3
- The walk through the shop for the real capability list.
- Week 4
- The quote log read-out to your owner: win rate by channel, buyers who went quiet, and the share from your top three buyers.
- Week 6
- Capability page drafts to your engineer, and the quality page to your quality manager, for review.
- Week 7
- The RFQ form tested with real drawings. The follow-up rule set for every open quote.
- Week 8
- Capability pages, the quality page, and the RFQ form live. A current capability sheet to every rep firm and distributor.
- Week 10
- The target list, approved by your owner. Research briefs and follow-up drafts start.
- Week 11
- A one-time catch-up on every scan from the last trade show before kickoff, with scans from a rep's territory sent to that rep. Shows after kickoff get their follow-ups within 2 business days.
- Week 13
- The first monthly report closes the quarter, and the next 90 days are written.
14. What Counts as Done
Why It's Here
Each step ends on a written list, so Day 30, Day 60, and Day 90 are checkable instead of a matter of opinion.
Days 1 to 30 are done when
- The morning ERP export reaches the RFQ log every day.
- Every RFQ since Week 2 is in the log, with a source.
- Your owner has the quote log read-out: win rate by channel, buyers who went quiet, and the top-three share.
Days 31 to 60 are done when
- Capability pages for your top processes are live, each approved by your engineer.
- The quality page is live, approved by your quality manager.
- A test RFQ with a drawing reached the right estimator the same business day.
- Every rep firm and distributor has the current capability sheet.
Days 61 to 90 are done when
- Your owner has approved the target list, and 15 accounts and 5 briefs go out each week.
- Every open quote has its day 3 and day 10 follow-ups drafted.
- Every scan from the last trade show has been followed up, passed to its rep, or held with a reason.
- The first monthly report has closed the quarter.
Each month after is done when
- Every RFQ is logged with its source, and every lead from a rep's territory reached that rep the same business day.
- Every open quote got its follow-ups, or a reason it was held.
- Sheets went out within a week of any change in the shop's capabilities.
- The report reached you by the fourth business day.
15. Not in This Scope
Why It's Here
Estimating, quality claims, and selling stay with the shop. Ads or a new CRM come in only by written change.
Estimating and quoting, quality claims beyond the documents your quality manager supplies, a new CRM, ad campaigns, a website rebuild, and LinkedIn automation. Any of them can come in later, through the change rule below.
16. Changes
Why It's Here
Your owner approves every change first, from a new process page to an AI tool for drawings, so the report matches this scope.
Either side can ask for a change, such as a new process page, another rep territory, or an AI tool that reads drawings. It's written into this scope with its date, your owner approves it, and the work changes after that.
17. How Billing Works
Why It's Here
The first 90 days, in three steps, are the setup, and the RFQ work after Day 90 runs month by month.
Projects are a fixed price per phase. Monthly work is billed monthly. Any software you pay for is listed in your scope.
18. Terms
Why It's Here
After Day 90 the work has to earn each month, and everything built stays with the shop if you stop.
- The first 90 days, in three steps, then month to month.
- During the first 90 days, you can stop with 7 days' written notice, for the setup work not yet started.
- After Day 90, you can stop on 7 days' written notice, and Apex Local gives 30 days' written notice before the monthly work ends.
- The RFQ log, the target list, the pages, and every workflow stay with the shop.
